Life in the City
Alatau is a city of regional significance in the Almaty Region of Kazakhstan. It was established on 9 January 2024 by a Decree of the President of Kazakhstan through the transformation of the village of Zhetygen, and as of the end of 2025 its population was approximately 55,000. Schools and medical facilities operate in the existing microdistricts, and utility infrastructure is being developed. New districts and city facilities are being created in stages.
In international materials, the city is also referred to as Alatau City. The Master Plan defines Alatau’s development through to 2050.

Where the City Is Located
Alatau is located approximately 47 km from Almaty and 35 km from Konaev, along the A3 highway connecting the two cities. Distances and travel times depend on the specific microdistrict and destination.
Proximity to the country’s largest city largely shapes the daily lives of Alatau residents: the business, retail and cultural centre of the agglomeration can be reached via the A3 highway, and some of residents’ work, study and everyday journeys are still linked to Almaty.
Part of Alatau’s territory extends to the Kapshagay Reservoir. The city covers an extensive area of approximately 88,000 hectares, including existing residential microdistricts and areas for new development.
Who Lives Here
According to the Alatau Akimat, approximately 55,000 people lived in the city at the end of 2025. Alatau comprises twelve microdistricts formed from former villages that became part of the city: Zhetygen, Koyankus, Yntymak, Enbek, Arna, Daulet, Zhanaarna, Zhanatalap, Zhanadaur, Kairat, Kuigan and Zarechny.
As the population grows, the development of schools, medical, sports and other social facilities becomes particularly important.
Housing and Everyday Travel
Living conditions vary depending on the microdistrict. When choosing housing, it is important to consider access to schools and medical facilities, the building’s connection to utility networks, the condition of access roads and the location of bus stops.
If your work or studies are linked to Almaty, it is worth checking the route and travel time during rush hour in advance. Information on road, bus and rail services is available in the “Transport and Accessibility” subsection.
Who Governs the City
Alatau’s governance is more complex than that of an ordinary city: alongside the local authorities, there are bodies responsible for its accelerated development.
Akimat
The Akimat is the local executive body. It is responsible for day-to-day city management, infrastructure development, public utilities, the social sphere and urban improvement. Arken Utenov has been the Akim of Alatau since 2024.
Maslikhat
The Maslikhat is an elected representative body that represents the interests of the city’s residents. Its deputies approve Alatau’s development plans and local budget and monitor their implementation.
Alatau City Council
Strategic matters are considered by the Alatau City Council, chaired by the Prime Minister of Kazakhstan.
Alatau City Authority
The Alatau City Authority (ACA) is responsible for implementing the special legal regime, developing the city and attracting investment.
Everyday Services Today
Basic city services are concentrated primarily in Alatau’s existing microdistricts.
Education. 18 schools already operate in the city, and the network of educational facilities is being expanded. The 600-place Keleshek comfort school has been built in the Enbek microdistrict. Another new 900-place school with a STEM focus has been built in Koyankus under the Keleshek national project.
Healthcare. Primary healthcare is provided by paramedic and midwifery stations and outpatient clinics, including in Enbek, Zhanaarna, Yntymak, Zarechny and Zhanadaur. Zhetygen has adult and children’s hospitals where residents can undergo examinations and consult specialists. A unit of the Ili Central District Hospital operates in Koyankus.
Where necessary, residents are referred to other medical organisations in the region for specialised care.
Utility networks. Utility infrastructure is gradually being upgraded in the existing microdistricts: new power and water supply lines are being laid, sewerage networks are being repaired, and some areas are being connected to the gas supply.
Urban improvement. In 2025, approximately 13.7 km of roads were repaired and asphalted, and a further 19 km received crushed stone surfacing. Bus stops, street lighting and road safety features are being upgraded.
Jobs close to home. Industry and logistics are developing in Alatau: an industrial park is operating, new manufacturing projects are being implemented, including the construction of a PepsiCo plant, and transport and logistics infrastructure is being developed. As new projects are launched, employment opportunities directly in Alatau will expand. Recruitment for new enterprises is taking place in stages.
Culture and sport. A House of Culture operates in the Arna microdistrict, hosting events and creative clubs. The network of cultural and sports facilities is gradually expanding: new facilities are being built and planned in various microdistricts of the city.
More information on operating institutions and new facilities is available in the “Social Infrastructure” subsection.
Under Construction and Planned
What Is Being Built and Will Appear in the Coming Years
Alongside the development of new districts, the infrastructure of Alatau’s existing microdistricts is being modernised. New schools, medical, cultural and sports facilities are being built and planned.
A 900-place school is planned in Zhanadaur. New polyclinics are planned in Zhetygen, Koyankus and Zhanadaur. The Akimat’s announced plans for 2026 included the start of construction of a House of Culture in Zhetygen, a sports and fitness centre in Zarechny and a sports hall in Koyankus. These are the planned start dates for works, not the dates when the facilities will open to residents.
At the same time, the city’s utility infrastructure is being developed. Power, water, gas and wastewater facilities are being built and reconstructed, and the road network is being developed. Infrastructure is being created in stages, taking into account the development of existing microdistricts and new areas.
What Alatau Will Become
Most of the city’s development is yet to come. According to the Master Plan, Alatau’s population could reach approximately 1.87 million by 2050.
The Master Plan provides for four functional districts: Gateway District focuses on business and finance, Administrative City Center on education and healthcare, Growing District on industry and logistics, and Green District on tourism and recreation along the Kapshagay Reservoir. These planned districts should not be confused with the city’s twelve existing microdistricts.
As Alatau develops, the construction of new schools, kindergartens, medical, cultural and sports facilities is envisaged, as well as the creation of parks and public and pedestrian spaces. The transport system is intended to connect the existing microdistricts and the city’s new districts with each other and with the Almaty agglomeration.
Alatau is also being designed as a digital city, where city services and infrastructure are planned to be integrated through digital management systems.
It is important to distinguish these plans from the city’s current state: development is planned over decades and is being implemented in stages.
Key Facts
Date of Establishment
9 January 2024 (Decree of the President of the Republic of Kazakhstan)
Population
approximately 55,000 (according to the Akimat, as of the end of 2025)
Microdistricts
12
Akim of the city
Arken Utenov (since 2024)
Operating schools
18
Operating Keleshek schools
600 places in Enbek, 900 places in Koyankus
Roads repaired in 2025
approximately 13.7 km (plus 19 km of crushed stone surfacing)
Master Plan horizon
Through 2050
Projected population by 2050
Approximately 1.87 million
Functional districts
4 under the Master Plan