Transport and Accessibility

Alatau is located approximately 47 km from Almaty and 35 km from Konaev, along the A3 highway connecting the two cities. A railway line also runs through the city. Today, Alatau can be reached by car, bus or train, while city bus routes provide travel between microdistricts.

The transport framework of the new city is gradually taking shape: the road network is being modernised, and the Master Plan provides for the development of rail transport and the construction of an international airport. Urban air mobility, including air taxis, is being developed as a separate area.

Транспортная инфраструктура Алатау

How to Get to Alatau

By car

The main route runs along the A3 Almaty – Konaev highway, which crosses Alatau’s territory. The Big Almaty Ring Road (BAKAD) and the Almaty – Shelek – Khorgos highway run nearby, providing access to other transport routes in the Almaty Region. Distance and travel time depend on the microdistrict, starting point and traffic conditions.

By bus

From Almaty, Zhetygen can be reached by bus No. 220 from Raiymbek Batyr metro station or bus No. 223 from Almaty-1 railway station. These routes use different stops in Zhetygen, so check where you need to get off before travelling.

Routes No. 1 and No. 2, launched in March 2026, provide connections within the city and with neighbouring settlements; they pass through Kuigan, Enbek, Zhanaarna, Zhanatalap, Zhanadaur, Koyankus, Gateway District, Otegen Batyr and other locations. The routes serve different stops, so check the route map of the bus you need before travelling.

By train

A railway line runs through Alatau. Zhetygen station is connected to Almaty-1 station by trains and suburban electric trains, so Almaty can also be reached by rail. For example, according to the October 2026 timetable, train No. 022T covers the Almaty-1 – Zhetygen section in about 50 minutes, and suburban train No. 886Kh in 1 hour 12 minutes. Travel times and operating days depend on the service. Check the current train timetable before travelling.

Roads and Transport Within the City

Within the city, it is important to connect the existing microdistricts with new development areas. The road network is currently being modernised step by step: existing roads are being repaired, new sections are being built, and bus stops and street lighting are being upgraded.

At a meeting of the Alatau City Council in August 2026, plans were outlined for medium repairs of 61.2 km of roads and the construction of 15 km of new roads. These figures reflect planned works, not completed repairs.

The second stage of the Infrastructure Development Roadmap for 2028–2030 provides for the construction of 49 km of roads. The Master Plan provides for the development of major transport interchanges on the A3, BAKAD and other highways.

Looking Ahead

How Transport Will Develop

In the long term, Alatau’s transport system is to be based on roads, surface public transport and several types of rail services.

Within the city, the Master Plan provides for a 76.2-kilometre light rail transit (LRT) network that will connect all four districts. For links with the agglomeration, it envisages high-speed rail services between Almaty, Alatau and Konaev, as well as airport express trains to Almaty Airport and the future Alatau Airport. Specific routes and timelines for these projects are still being worked out.

Commercial air taxi services using electric vertical take-off and landing (eVTOL) aircraft are scheduled to launch in late 2028 – early 2029. More information on air taxi projects and related infrastructure is available in the subsection on urban air mobility.

Railway and Transport Hub

Rail transport is to become one of the key elements of Alatau’s external connectivity. In addition to the existing Zhetygen station, the Master Plan provides for a new railway station for international, intercity and suburban services.

The Master Plan also provides for the Zhetygen – Kazybek Bek railway section to be implemented by 2030. It is intended to strengthen Alatau’s links with international transport corridors.

Future Airport

The Master Plan provides for the construction of Alatau’s own international airport on the city’s western boundary. Construction is scheduled to begin after 2040.

A railway station is planned next to the airport: together they are to form a major transport interchange hub connected to Almaty, Konaev and other districts of the city.

Why the Transport Framework Matters

For a new city, transport is not only a matter of convenience but also a precondition for development. Roads, rail lines and air services determine how quickly new districts are built, investors arrive and jobs are created. At the same time, transport shapes residents’ everyday lives: access to Almaty, travel time to work and study, and connections between microdistricts. That is why transport infrastructure is being developed alongside new areas and the construction of city facilities.

Key Facts

Distance to Almaty

approximately 47 km

Distance to Konaev

approximately 35 km

Main road

A3 Almaty – Konaev highway

Buses to Almaty

No. 220 (to Raiymbek Batyr metro station), No. 223 (to Almaty-1 railway station)

City routes

No. 1 and No. 2 (since March 2026)

Railway station

Zhetygen (services to Almaty-1 station)

Travel time Almaty-1 – Zhetygen

approximately 50 minutes on train No. 022T or 1 hour 12 minutes on suburban train No. 886Kh, according to the October 2026 timetable

LRT network under the Master Plan

76.2 km, connecting all four districts

Road works

medium repairs of 61.2 km and construction of 15 km of new roads planned (Alatau City Council, August 2026)

Roads under the 2028–2030 Roadmap

construction of 49 km

International airport

construction to begin after 2040 under the Master Plan

Railway station

provided for in the city’s Master Plan

Frequently Asked Questions